INTRODUCTION :
In biogas plants fixed dome, there has been common draw- back that its dome develops hair cracks, which are not seen with the naked eye, through which the gas stored leaks out. The conventional method of repairing is either with applying oil paint or tar coat over plastering the inner surface has not proved to be result oriented as a film of oil paint is too thin and tar does not have good bonding with any cemented surface and even plaster also develops cracks and peels off due to change in compressive strength between the old and new plaster.
Ultimately, due to large number of failures of Fixed Dome Plants, people lose faith in this particular model and opt for Floating Gas Holder Plant, through it is a well know fact that fixed dome type plants have various advantages over the other model such as reducing cost factor, longer life, less maintenance, utilization of space over the dome etc.
To overcome this burning problem of gas leakage’s from fixed –Dome Type model, we therefore For over past decade, have introduced an unique product DIBHAPOXY-225 which has rendered us excellent result and has proved to be an ultimate solution to the said problem. Our product has very widely been used by Semi government and even with Private voluntary organizations basically engrossed with the constructions of Biogas plants.
FIELD OF APPLICATIONS :
Coating Dome from Inner surface of Bio-gas Concrete plant.